{"product_id":"mep-systems-design-sequence-manual-part-2-commissioning-testing-handover","title":"MEP Systems Design Sequence Manual — Part 2: Commissioning, Testing \u0026 Handover","description":"\u003cp dir=\"ltr\"\u003ePart 1 gave you every calculation. Part 2 covers everything that comes after.\u003c\/p\u003e\n\u003cp dir=\"ltr\"\u003eDrawn from an executed 28-floor high-rise specification — in the Middle East, designed to ASHRAE, NFPA, and BS EN standards — this volume takes your completed design through to a signed handover receipt.\u003c\/p\u003e\n\u003cp dir=\"ltr\"\u003e15 chapters across 5 parts:\u003c\/p\u003e\n\u003cul dir=\"ltr\"\u003e\n\u003cli\u003eWriting MEP specifications and equipment schedules that protect you contractually\u003c\/li\u003e\n\u003cli\u003eHydraulic pressure testing, pipe flushing, and chlorination procedures\u003c\/li\u003e\n\u003cli\u003eCommissioning HVAC, fire, water, and BMS systems — with civil defense witness test preparation\u003c\/li\u003e\n\u003cli\u003eAuthority approvals: GCC civil defense NOC, UK building control, USA AHJ\u003c\/li\u003e\n\u003cli\u003eHandover: O\u0026amp;M manual structure, as-built requirements, training programs, defects liability\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp dir=\"ltr\"\u003eIncludes Supplement C — 5 standalone printable commissioning forms.\u003c\/p\u003e\n\u003cp dir=\"ltr\"\u003eFor junior-to-senior MEP engineers, design office teams, and site supervisors managing the construction and handover phase.\u003c\/p\u003e","brand":"WorkflowIQ","offers":[{"title":"Default Title","offer_id":46552797774020,"sku":null,"price":67.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0746\/1981\/4084\/files\/logopart2.png?v=1787307516","url":"https:\/\/workflowiq.store\/products\/mep-systems-design-sequence-manual-part-2-commissioning-testing-handover","provider":"WorkflowIQ","version":"1.0","type":"link"}